Development

Sr. No Category Work Details Probable date of completion Area/Beneficiaries
76 Water Supply Providing of 150mm dia AC Pipe line form D.No. 49/99 to 50/5 in Ravindra Nagar (Rider Line) 60
77 Water Supply Providing of Inter Connection from 300mm dia DI Pipe line with existing distribution lines in Nabikota Main Road in 47th Division. 954
78 Water Supply Laying of PVC Pipe line from D.No. 48/20 to 48/30 in Ravindra Nagar. 150
79 Water Supply Providing of Inter Connection from 150mm dia AC Pipe line with 90mm dia PVC Pipe line near D.No. 59/185-1 in 47th Division. 1474
80 Water Supply Supply, delivery and fixing of sluice valve at Veera Swamy Mandi Lane, Y.V. Street Gurrala Gadda, Brahamana Street and Gandhi Park ELSR main valves (ELSR Capacity 578 & 1000 KL) 1446
81 Water Supply Supply, delivery and fixing of Sluice Valve at Co.op. Colony ELSR 1600 KL 1442
82 Water Supply Supply, delivery and fixing of Sluice Valves in Butcher Street, nakash, near Pedda Dargh & Kummarkunta under Masapeta ELSR 500 KL 1501
83 Building Construction of Toilets, Dining hall, Kitchen and flooring to Dr. Jagjeevan Ram Community Hall in Prakash Nagar at Kadapa.  
84 Building Construction of New Community Hall to YSR Sports School at Kadapa.  
85 Water Supply Providing of Pipeline 90mm dia from 22/124 to 22/9 at Patha Kadapa in 1st division 198
86 Water Supply Supply, delivery and fixing of 300mm dia sluice valves and non return valves at Bandikanuma 225
87 Water Supply Providing of AC Pipe line from Indira Nagar to PMR Palli Cross road at Mamillapalli in 15th Division.  
88 Water Supply Providing of AC Pipe line from Seshagaripalli existing aC Line ot Lakulu Village in Palempalli Division.  
89 Water Supply Providing of AC Pipe line from lakulu Village to existing 150mm HDPE Pipe line nera Irocn Circle inPalempalli Division and Providing of 350mm dia AC Pipe line from Bandikanuma to Sub Jail.  
90 Building Construction of Addl Floor Building at Central Library.  
91 Building Construction of Community Hall at DM & HO Office ELSR site at Sastri Nagar. 148
92 Building Construction of Community hall at Bachumpalli 146
93 Drain Construction of CC Drain from 66/25 to 66/140 and 66/140 to 64/177-2 (Back side) Mariyapuram in 38th division 189
94 Drain Construction of CC Drain from 22/124 to 22/166-4-1 at Jogulapalli in Patha Kadapa. 112
95 Drain Construction of CC Drain from 80/179 to 80/213-1 at Rukavaripalli 45
96 Drain Construction of CC Drain from 80/182 to End of the Road at Rukavaripalli 77
97 Drain Construction of CC Drain from 80/202 to end of the Road at Rukavaripalli 64
98 Drain Construction of CC Drain from 80/202 to 80/183 at Rukavaripalli 53
99 Drain Construction of CC Drain from 80/220-1 to 80/226 at Rukavaripalli 44
100 Drain Construction of CC Drain from 80/178 to 80/220-1 at Rukavaripalli 25

Pages